
Solutions | Foundations
A stable start for everything above ground
Coordinate concrete foundation work with the structure and panel installation path.
Work sequence
From setting out to installation readiness
This sequence shows general coordination points and does not replace approved structural drawings.
- 01
Set out locations
Match axes to the array layout.
- 02
Coordinate levels
Review the site and structure interfaces.
- 03
Controlled execution
Maintain a clear work sequence.
- 04
Verify before mounting
Confirm readiness before structure work begins.